Welcome To Kariba North Bank Extension Power Coporation

A Subsiduary of ZESCO Limited
logo
Read More
  • Owned by ZESCO

    HydroPower Generation
  • 330/132/11KV substation

    Construction of Substation
  • 330KV outdoor switchyard

    Extension of Outdoor Switchyard

Transmission Lines

Project Description

In the year 2003, the Government of the of the Republic of Zambian entered into a bilateral agreement with the People’s Republic of China for construction of power generating stations to mitigate the power deficit the country was faced with.

Project Challenge

The project encountered many challenges that where faced during the intial stages and the final stages which include.

  • Challenges of Water Abstruction Facilities
  • Enviromental Challenges
  • Limited Man power

Result

The agreement resulted in signing of a Memorandum of Understanding (MoU) between ZESCO Limited and Sinohydro of China for construction of an additional 360MW of generating capacity at Kariba North Bank Power Station.

  • Clients

    ZESCO Limited
  • Categories

    Transmission Lines
  • Completed

    June 11 - 2019
  • Location

    Siavonga