Kariba North Bank Extension Power Corporation (KNBEPC) Limited
KNBE
Renewable Energy

KNBEPC

Renewable Energy

Solar and clean energy initiatives that diversify Zambia’s power mix.

The Chisamba 100 MW Solar PV Plant

The Chisamba 100MW Solar PV Plant is a landmark project in Zambia's energy sector, located in Kafungalubala Village in Chisamba District, Central Province.

Key Highlights

  • Commissioned: Officially commissioned by the Republican President Mr. Hakainde Hichilema on 30 June 2025, marking a significant milestone in Zambia's energy diversification journey.
  • Capacity: The plant has a capacity of 100 megawatts, making it Zambia's largest grid-connected solar initiative to date.
  • Investment: The project was developed at a cost of $100 million, financed through a mix of equity and debt, with Stanbic Bank Zambia providing a $71.5 million loan and ZESCO and KNBEPC contributing $30 million each in equity.
  • Developer: The project was developed by Kariba North Bank Extension Power Corporation (KNBEPC), a subsidiary of ZESCO Limited, with Power China International Group Limited serving as the engineering, procurement, and construction contractor.

Achievements

  • The Kariba North Bank Extension Power Station has fulfilled its main purpose in mitigating the power deficit in the country which was experienced during peak hours.
  • The Chisamba 100MW Solar PV Plant is a significant milestone for KNBEPC and the first largest solar plant in Zambia's history.
  • The solar plant is the first largest grid-connected solar initiative generating clean energy in Zambia.
  • The plant has added 100MW of renewable energy capacity to the grid aimed at reducing load shedding especially during low hydropower seasons.
  • The Chisamba 100 MW PV Solar plant has reduced the country's reliance on hydropower, which has been affected by droughts.
  • The plant has strengthened Zambia's energy mix, by supporting industrial and domestic power demands, contributing to long-term climate and economic development goals.
  • Transferred skills to local youths during construction.
  • Created over 1,200 jobs (98% local) during construction, and 100 permanent jobs.

Stay Updated